DEQ Calendar of Events
The following is a list of comment deadlines, training, advisory committee meetings, conferences, DEQ public meetings, and events that are sponsored by, or directly related to, the Wyoming Department of Environmental Quality.
|
Q U I C K J U M P |
|||||
|
2013 |
|||||
|
March 2013 |
30- The Wyoming Water and Waste Advisory Board will meet on March 21, 2013 at 9:00 AM in the Auditorium of the Oil and Gas Conservation Commission, Basko Building, 2211 King Boulevard, Casper, Wyoming. The Solid and Hazardous Waste Division is requesting the board’s consideration regarding grant requests for reimbursement to local governments conducting solid waste landfill monitoring pursuant to W.S. 35-11-521 for the Solid and Hazardous Waste Division. Additional information is available at: http://deq.state.wy.us/shwd/
Call For Bid
25- The Restoration Advisory Board for the former nuclear missile site on the Belvoir Ranch west of Cheyenne will be held April 25, 2013 at the Laramie County Library, in the Cottonwood Room. The meeting starts with an open house for the public to view posters and ask questions at 5:30 pm. The presentation on current activities at the site will be at 6:00 p.m. The library is located at 2200 Pioneer Ave.
15 Non Point Task Force Public Meeting- 9 AM-12:00 PM Crook County Extention Office, SUndance WY
The Wyoming Department of Environmental
Quality/Abandoned Mine Land Division (WYDEQ/AML), AML
Project 17.6A-6 and 17.6A-7.
These Projects consist of drilling and grouting of abandoned
mine lands. The
following areas will be mitigated:
·
South Side Belt
Route adjacent to Stable Lane;
·
Near the Joint
Powers Water Board tank at the intersection of Walnut Street
and the South Side Belt Route;
·
Grant Street
Extension; and
·
Blairtown Park
(final phase of Blairtown Park).
As we continue with the mitigation efforts, we appreciate your continuing patience. Traffic disruptions are anticipated to be minimal during the course of the work. The work within Blairtown Park will be done within the previously fenced in area. All work is anticipated to be completed by December 2013. The Contractor is Nucor, Inc. and the Engineer is JFC Engineers & Surveyors. If there are any questions please contact:
JFC Engineers & Surveyors
1515
rgerrard@jfc-wyo.com